FIAT / DUCATO 244eLearn workshop manual · English · Offline edition
Procedures

1042A40 CNG REPRESSURIZING PIPE FROM VALVE TO HOSE COUPLING - R.R.

Engines: 2.0 16V
Engines: 2.0 16V

RemovingManual illustration 20

RefittingManual illustration 21
Position the vehicle on the lift.Proceed with draining the high pressure circuit following the instructions in the specific operation:Op. 1042A02 METHANE SYSTEM SAFETY SET UP1. Release the safety pipe.2. Undo the connector from the hose.
Manual illustration 244006728
Engines: 2.0 16V
1. Undo the retaining bolts.2. Remove the load carrying compartment side trim cover.
Manual illustration 244006729
Engines: 2.0 16V
1. Remove the retaining buttons (1b) using the tool (1a).
[symbol: attrezzi.tif]DescriptionCodeFunction
1aKnife1.878.077.000Remove fastening studs
2. Remove the side load carrying compartment trim.
Manual illustration 244006730
Engines: 2.0 16V
1. Undo the bands (1a) and release the safety pipe (1b).2. Undo the connector and disconnect the canister repressurizing pipe.Release the CNG repressurizing pipe complete with safety pipe and remove it.
Manual illustration 244006731
Engines: 2.0 16V

RefittingManual illustration 21

RemovingManual illustration 20
Fit the CNG repressurizing pipe complete with safety pipe.Connect the canister repressurizing pipe and tighten the connector to the recommended torque.
[symbol: coppie.tif]Value daNmFasteningComponentØ  
-2.8Connector--
Restore the position of the safety pipe and secure it using the special bands.Place the load carrying compartment side trim in position and secure it using the special fixing buttons.Place the load carrying compartment side trim cover in position and tighten the fixing bolts.Raise the vehicle.Tighten the connector to the hose and reposition the safety pipe.
[symbol: coppie.tif]Value daNmFasteningComponentØ  
-2.8Connector--
Move the CNG cut-off solenoids to open position by hand and check system is efficient.Remove the vehicle from the lift.