FIAT / DUCATO 244eLearn workshop manual · English · Offline edition
Procedures

1042A42 CNG RECHARGING PIPE FROM SLEEVE TO 3-WAY FITTING - R R

Engines: 2.0 16V
Engines: 2.0 16V

RemovingManual illustration 20

RefittingManual illustration 21
Position the vehicle on the lift.Proceed with draining the high pressure circuit following the instructions in the specific operation:Op. 1042A02 METHANE SYSTEM SAFETY SET UP1. Release the safety pipe.2. Undo the connector from the hose.
Manual illustration 244006734
Engines: 2.0 16V
1. Undo the connector on the single acting valve.2. Undo the retaining bolts.3. Remove the CNG repressurizing pipe from the three-way coupling hose.
Manual illustration 244006735
Engines: 2.0 16V

RefittingManual illustration 21

RemovingManual illustration 20
Fit the CNG repressurizing pipe and tighten the connector to the single-acting valve.
[symbol: coppie.tif]Value daNmFasteningComponentØ  
-2.8Connector--
Tighten the three bolts fixing the CNG repressurizing pipe.Tighten the connector and reposition the safety pipe.
[symbol: coppie.tif]Value daNmFasteningComponentØ  
-2.8Connector--
Move the CNG cut-off solenoids to open position by hand and check system is efficient.Remove the vehicle from the lift.