Position the vehicle on the lift.Proceed with draining the high pressure circuit following the instructions in the specific operation:Op. 1042A02 METHANE SYSTEM SAFETY SET UP1. Release the safety pipe.2. Undo the connectors (2a) and remove the hose (2b).