Procedures
1042A50 PIPE (1) CONNECTING CNG RECHARGING SYSTEM SOLENOIDS - R R
Engines: 2.0 16V
Removing
Position the vehicle on the lift.Proceed with draining the high pressure circuit following the instructions in the specific operation:Op. 1042A02 METHANE SYSTEM SAFETY SET UPOp. 1042E60 CNG CYLINDER UNIT PROTECTION SEAL - R RDisconnect the electrical connections for the cut out solenoid valves on the canisters.1. Undo the connectors from the solenoid valves on the canister.2. Remove the CNG solenoid valve connecting pipe.
Engines: 2.0 16V
Refitting
Fit the CNG solenoid valve connecting pipe and tighten the connectors on the canister solenoid valves.| [symbol: coppie.tif] | Value daNm | Fastening | Component | Ø |
|---|---|---|---|---|
| - | 2.8 | Connector | - | - |
Engines: 2.0 16V
Equipment / version codes: Upgraded autonomy [A106]
Equipment / version codes: Upgraded autonomy [A106]
Removing
Position the vehicle on the lift.Proceed with draining the high pressure circuit following the instructions in the specific operation:Op. 1042A02 METHANE SYSTEM SAFETY SET UPDisconnect the electrical connections for the cut out solenoid valves on the canisters.Engines: 2.0 16V
Equipment / version codes: Upgraded autonomy [A106]
Equipment / version codes: Upgraded autonomy [A106]
Engines: 2.0 16V
Equipment / version codes: Upgraded autonomy [A106]
Equipment / version codes: Upgraded autonomy [A106]
Engines: 2.0 16V
Equipment / version codes: Upgraded autonomy [A106]
Equipment / version codes: Upgraded autonomy [A106]
Refitting
To assemble the connecting pipe between the centre canister and the rear canister, proceed as described below.Position the CNG solenoid valve connecting pipe involved.Tighten the pipe connector to the three-way connector.| [symbol: coppie.tif] | Value daNm | Fastening | Component | Ø |
|---|---|---|---|---|
| - | 2.8 | Connector | - | - |
| [symbol: coppie.tif] | Value daNm | Fastening | Component | Ø |
|---|---|---|---|---|
| - | 2.8 | Connector | - | - |
Engines: 2.0 16V
Equipment / version codes: Upgraded autonomy [A106]
Equipment / version codes: Upgraded autonomy [A106]
To assemble the connecting pipe between the front canister and the centre canister, proceed as described below.Position the CNG solenoid valve connecting pipe.Tighten the connectors for the solenoid valve on the canister.
| [symbol: coppie.tif] | Value daNm | Fastening | Component | Ø |
|---|---|---|---|---|
| - | 2.8 | Connector | - | - |
Engines: 2.0 16V
Equipment / version codes: Upgraded autonomy [A106]
Equipment / version codes: Upgraded autonomy [A106]
Connect the electrical connections for the cut out solenoid valves on the canisters.Move the CNG cut-off solenoids to open position by hand and check system is efficient.Remove the vehicle from the lift.

