FIAT / DUCATO 244eLearn workshop manual · English · Offline edition
Procedures

1048B22 AIR DELIVERY SLEEVE FROM HEAT EXCHANGER TO INTAKE MANIFOLD - R + R

Engines: 2.3 JTD 16V, 2.8 JTD 8V
Engines: 2.3 JTD 16V

RemovingManual illustration 20

RefittingManual illustration 21
1. Disconnect the electrical connection for the right front light cluster.
Manual illustration 244000463DescriptionConnector
1Right headlampF011
2. Disconnect the bands at the two ends and remove the air pipe from the air/air heat exchanger to the intake manifold.
Manual illustration 244002743
Engines: 2.3 JTD 16V

RefittingManual illustration 21

RemovingManual illustration 20
- Fit the air supply hose from the heat exchanger to the intake manifold.- Connect the bands at the two ends of the air pipe from the air/air heat exchanger to the intake manifold.- Connect the electrical connection for the right front light cluster.
Manual illustration 244000463DescriptionConnector
.Right headlampF011
Engines: 2.8 JTD 8V

RemovingManual illustration 20

RefittingManual illustration 21
1. Open the retaining band (1a) on the rigid air supply pipe and the band (1b) on the heat flange.2. Remove the hose.
Manual illustration 244002744
Engines: 2.8 JTD 8V

RefittingManual illustration 21

RemovingManual illustration 20
- Fit the hose in place.- Tighten the retaining bands.