Procedures
1048B20 AIR DELIVERY SLEEVE FROM HEAT EXCHANGER TO RIGID PIPE - REPLACE
Engines: 2.8 JTD 8V
Removing
1. Open the retaining band (1a) on the rigid pipe and the band (1b) on the heat exchanger.2. Remove the hose.
Engines: 2.8 JTD 8V
Refitting
- Fit the hose in position.- Tighten the retaining bands.