Engines: 2.0 16V Production: Through February 2005 [¢]
Drain the low pressure circuit as described in the operation:Op. 1042A02 METHANE SYSTEM SAFETY SET UP1. Unscrew the connectors of the pipe from the pressure reduction unit and single manifold pipe.2. Remove the CNG supply pipe from reduction unit to single manifold.
Engines: 2.0 16V Production: From March 2005 [p]
Drain the low pressure circuit as described in the operation:Op. 1042A02 METHANE SYSTEM SAFETY SET UP1. Unscrew the connectors of the pipe from the pressure reduction unit and single manifold pipe.2. Remove the CNG supply pipe from reduction unit to single manifold.