Manual / Procedures / ENGINE UNIT / GAS CIRCUIT / GAS CIRCUIT MULTI POINT INJECTION Procedures
1058A80 CNG INJECTION UNIT CONTROL UNIT - R R EngineAll engines 2.0 16V 2.0 JTD 8V 2.3 JTD 16V 2.8 JTD 8V Print / save PDF
Engines: 2.0 16V
Removing Disconnect the negative battery terminal. Op. 7045A12 FRONT PASSENGER SEAT(S) - R.R. Release the floor trim at the side. 1. Undo the fixing bolts (1a) and remove the protective cover (1b) for the CNG system control unit. 2. Disconnect the electrical connections (2a) and remove the CNG control unit (2b). [symbol: elettrico.tif] Description Connector 2a Methane injection control unit M019A
[symbol: elettrico.tif] Description Connector 2a Methane injection control unit M019B
Engines: 2.0 16V
Refitting Position the CNG system control unit and connect the electrical connections. [symbol: elettrico.tif] Description Connector - Methane injection control unit M019A
[symbol: elettrico.tif] Description Connector - Methane injection control unit M019B
Fit the protective cover for the CNG system control unit and tighten the fixing bolts to the recommended torque. [symbol: coppie.tif] Value daNm Fastening Component Ø - 0.8 Bolt - M6
Restore the position of the floor covering. Op. 7045A12 FRONT PASSENGER SEAT(S) - R.R. Connect the negative battery terminal. Extracted from your eLearn disc. Original wording and values retained. Engine, equipment and production labels accompany each passage. Some original embedded symbols are unavailable and are marked in place.