Procedures
1088B10 ENGINE COOLING TANK - R + R
Engines: 2.8 JTD 8V
Engines: 2.8 JTD 8V
Refitting
- Fit the engine cooling reservoir and tighten the retaining nuts.- Connect the coolant pipes to the reservoir. Op. 0010T21 COOLANT CHECK DENSITY AND TOP UP IF NECESSARYEngines: 2.0 JTD 8V
Engines: 2.0 JTD 8V
Refitting
- Fit the engine cooling reservoir and tighten the retaining nuts.- Connect the hose to the rigid section of the coolant inlet pipe to the reservoir.- Connect both recirculation pipes leading from the cylinder head and from the radiator to the reservoir. Op. 0010T21 COOLANT CHECK DENSITY AND TOP UP IF NECESSARYEngines: 2.3 JTD 16V
Removing
1. Disconnect the collare securing the coolant hoses to the reservoir.2. Release the electrical connection shown from its seat on the reservoir.3. Undo the nuts securing the engine coolant reservoir.4. Disconnect hose (4a) carrying fluid to the coolant pump and remove the cooling reservoir (4b).
Engines: 2.3 JTD 16V
Refitting
- Fit the engine cooling reservoir and tighten the retaining nuts.- Connect the hose to the rigid section of the coolant inlet pipe to the reservoir.- Secure the electrical connection removed previously in its seat.- Connect both recirculation pipes leading from the cylinder head and from the radiator to the reservoir. Op. 0010T21 COOLANT CHECK DENSITY AND TOP UP IF NECESSARYEngines: 2.0 16V
Engines: 2.0 16V


