Procedures
1088D18 HOSE BETWEEN RIGID PIPE AND THERMOSTAT - R.R.
Engines: 2.8 JTD 8V
Engines: 2.8 JTD 8V
Refitting
- Fit the hose on the thermostat and on the rigid pipe and renew the fastenings using the bands. See in Op. 1048A21 Op. 0010T20 COOLANT CHECK DENSITY AND TOP UP IF NECESSARYEngines: 2.0 JTD 8V
Removing
- Position the vehicle on the lift. Op. 7055B54 UNDER-ENGINE GUARD - R R- Position a suitable container for collecting the coolant.1. Disconnect the lower hose from the rigid pipe (1a) and from the thermostat (1b).2. Remove the hose from the rigid pipe to the thermostat.
Engines: 2.0 JTD 8V
Refitting
- Fit the hose from the rigid pipe to the thermostat.- Connect the hose to the rigid pipe and to the thermostat. Op. 0010T20 COOLANT CHECK DENSITY AND TOP UP IF NECESSARY Op. 7055B54 UNDER-ENGINE GUARD - R REngines: 2.3 JTD 16V
Removing
- Position the vehicle on the lift. Op. 7055B54 UNDER-ENGINE GUARD - R R- Disconnect the lower radiator pipe.- Lower the vehicle.1. Remove the air delivery sleeve to the air - air heat exchanger (Intercooler).
Engines: 2.3 JTD 16V
Engines: 2.3 JTD 16V
Engines: 2.3 JTD 16V
Engines: 2.3 JTD 16V
Engines: 2.3 JTD 16V
Refitting
- Fit the sleeve connecting the thermostat to the rigid pipe.- Fit the air pipe from the intercooler to the intake manifold and connect the collars to both ends.- Connect the right front light cluster electrical connection.![]() | Description | Connector |
|---|---|---|
| . | Right headlamp | F011 |





