FIAT / DUCATO 244eLearn workshop manual · English · Offline edition
Procedures

1058A90 CNG INJECTION WIRING HARNESS - ARRANGE

Engines: 2.0 16V
Engines: 2.0 16V

RemovingManual illustration 20

RefittingManual illustration 21
Position the vehicle on the lift.Disconnect the negative battery terminal.Raise the vehicle.1. Undo the retaining nuts.2. Remove the fastening studs.3. Remove vertical guard from its seat.
Manual illustration 244006918
Engines: 2.0 16V
1. Disconnect the electrical coupling.
[symbol: elettrico.tif]DescriptionConnector
1Engine / injection couplingD193
Manual illustration 244006920
Engines: 2.0 16V
1. Disconnect the electrical connections for the cut out solenoid valves on the canisters.
Manual illustration 244006921
Engines: 2.0 16V
Equipment / version codes: Upgraded autonomy [A106]
1. Disconnect the electrical connections for the cut out solenoid valves on the additional canisters.
Manual illustration 244006922
Engines: 2.0 16V
Release the wiring from the fastenings on the body and remove it.
Engines: 2.0 16V

RefittingManual illustration 21

RemovingManual illustration 20
Place the wiring in position and secure it to the bodyshell using the special fastenings.
Engines: 2.0 16V
Equipment / version codes: Upgraded autonomy [A106]
Connect the electrical connections for the cut out solenoid valves on the additional canisters.
Engines: 2.0 16V
Connect the electrical connections for the cut out solenoid valves on the canisters.Connect the electrical coupling.
[symbol: elettrico.tif]DescriptionConnector
-Engine / injection couplingD193
Place the vertical shield in position.Secure the vertical guard using the special buttons and fixing nuts.Lower the vehicle.Connect the negative battery terminal.Remove the vehicle from the lift.