Procedures
5040A79 PIPING BETWEEN THE COMPRESSORE AND THE FITTING PLATE ON THE ROOF PANEL - R.R.
Engines: 2.0 16V, 2.0 JTD 8V, 2.3 JTD 16V, 2.8 JTD 8V
Removing
- Position the vehicle on the lift.- Disconnect the negative battery terminal. Op. 0010T84 COOLANT FOR AIR CONDITIONING SYSTEM DEHYDRATE AND RECHARGE Op. 5040A44 AIR CONDITIONER DEHYDRATING FILTER/ACCUMULATOR - R+RRight side Op. 7210E68 REAR BUMPER - SIDE ELEMENTRight side Op. 5010B65 EVAPORATOR/CONVEYOR UNIT MIDDLE LINING on the roof panel - R.R. Op. 5010B61 EVAPORATOR/CONVEYOR UNIT SIDE LINING on the roof panel, left or right (one) - R.R.Right side Op. 5040C60 AIR CONDITIONING EVAPORATING UNIT - R.R.1. Undo the connector (1a) and disconnect pipe (1b) from the connector plate.
Engines: 2.0 16V, 2.0 JTD 8V, 2.3 JTD 16V, 2.8 JTD 8V
Equipment / version codes: Supplementary air conditioner [B42]
Equipment / version codes: Supplementary air conditioner [B42]
Engines: 2.0 16V, 2.0 JTD 8V, 2.3 JTD 16V, 2.8 JTD 8V
Equipment / version codes: Supplementary air conditioner [B42]
Equipment / version codes: Supplementary air conditioner [B42]
Engines: 2.0 16V, 2.0 JTD 8V, 2.3 JTD 16V, 2.8 JTD 8V
Equipment / version codes: Supplementary air conditioner [B42]
Equipment / version codes: Supplementary air conditioner [B42]


